FlyMarshall — The Sky Isn’t The Limit
ISRO GSLV-F18 on the launch pad at Satish Dhawan Space Centre, Sriharikota

ISRO's GSLV-F18 Places NVS-03 Navigation Satellite in Orbit

The 20th GSLV flight lifted off from Satish Dhawan Space Centre, Sriharikota, at 11:51 p.m. IST on October 30, 2026, and placed the 2,232-kilogram NavIC satellite into geosynchronous transfer orbit.

FlyMarshall Newsroom1 min read

Photo: ISRO

ISRO's GSLV-F18 lifted off from Satish Dhawan Space Centre, Sriharikota, at 11:51 p.m. IST on October 30, 2026 (18:21 UTC) and placed the NVS-03 navigation satellite into geosynchronous transfer orbit.

The flight was the 20th by the Geosynchronous Satellite Launch Vehicle. NVS-03 is the third second-generation NavIC satellite. After separation, the spacecraft is to raise its orbit and complete in-orbit checks before it is commissioned.

Key details

  • Payload mass: 2,232 kilograms. Orbit at injection: geosynchronous transfer orbit from SHAR.
  • Clocks: an indigenous rubidium atomic clock plus procured atomic clocks. Signals: L1, L5, and S-band.
  • NVS-02, flown on GSLV-F15 on January 29, 2025, reached transfer orbit but did not complete orbit raising after an electrical signal failed to reach a propulsion valve.

GSLV-F18 carrying NVS-03 lifts off from Satish Dhawan Space Centre, SHAR, Sriharikota.

Why it matters

NVS-03 is a NavIC replenishment satellite with an Indian rubidium clock and a civilian L1 signal, flown on a numbered GSLV after NVS-02 stayed in transfer orbit.

What happens next

ISRO said NVS-03 will now raise its orbit and go through in-orbit checks before commissioning. When will the first apogee-raising burn be reported?

Discuss in ThreadsSpace

The FlyMarshall Briefing

The sky, explained. Weekly.

One dispatch on the aircraft, airlines and operations that mattered, no clickbait, no filler.

Free. Unsubscribe anytime. Privacy