
Navy Submarine Chief Says Columbia-Class Delivery in 2028 Remains Achievable
Vice Adm. Rob Gaucher says the first Columbia-class submarine, District of Columbia, can meet its 2028 delivery target.
Vice Adm. Rob Gaucher, the Navy’s Direct Reporting Portfolio Manager for Submarines, said delivering the first Columbia-class submarine, District of Columbia, in 2028 remains achievable. He described the schedule as difficult and said it will require significant work.
Key details
- General Dynamics Electric Boat and HII’s Newport News Shipbuilding are building District of Columbia.
- The second submarine in the class is named Wisconsin.
- At a February 2026 conference, Rear Adm. Todd Weeks said District of Columbia was about 65% complete and Wisconsin about 35% complete.
- The Navy and its shipbuilding partners set an acceleration plan in 2025 to deliver all Columbia-class modules to Electric Boat’s final assembly yard in Groton, Connecticut, by the end of that year.
- Leonardo DRS developed the class’s electric-drive power-propulsion system.
Rear Adm. Todd Weeks said District of Columbia was about 65% complete in February 2026.
More stories

AUKUS Partners Advance Submarine Plans and Joint Capabilities

SpaceX Wins SDA Study Contract for Optical Links to Tracking Satellites

US Air Force Names Four GB1 Gamebirds T-19A Kestrels

AUKUS Submarine Rotations at HMAS Stirling Move Toward First U.S. Assignment

40-Drone Swarm Exercise at California's National Training Center

