
TRV-150 Tests Three-Pod APKWS Launcher at Eglin
A modified Malloy Aeronautics T-150 reportedly engaged aerial targets at Eglin Air Force Base in late September using a launcher fitted with laser-guided APKWS rockets.
FlyMarshall Newsroom2 min read
Photo: The Aviationist
BAE Systems said a modified Malloy Aeronautics T-150, designated TRV-150, took part in counter-uncrewed aircraft system trials at Eglin Air Force Base, Florida, in late September 2026. The company said the aircraft used a three-pod launcher carrying laser-guided APKWS rockets and engaged multiple aerial targets in succession without landing to reload. The source does not identify the target-drone types or give a precise target count.
The TRV-150 carried three launcher pods and engaged multiple aerial targets without landing to reload.
Key details
The trial details come from an account attributed to BAE Systems, but the fact set does not classify them as officially confirmed. It rates the test and launcher account as likely. The reported affiliation with a Mission Capabilities Joint Readiness Experimentation exercise is unconfirmed. The source also describes SURVICE Engineering as a collaborator on adapting the aircraft to U S. Army requirements and BAE Systems’ FalconWorks division as responsible for developing and integrating the APKWS modification; those details are rated likely, not officially confirmed.
Why it matters
The reported trial combines a vertical-takeoff-and-landing aircraft with a launcher carrying three pods of guided rockets. For aviation and defense readers, the test offers a concrete example of how an uncrewed aircraft platform can carry a multi-round payload and engage successive aerial targets without returning to land between engagements.
What happens next
BAE Systems said it intends to explore maritime counter-drone use for the T-150/TRV-150. The reported Eglin trial did not demonstrate maritime operations, and the source provides no schedule for further testing.
More stories

GA-ASI Names Spirit Defense as FQ-42A Fuselage Production Partner
NASA Plans 14-Day Artemis III Mission to Test Lunar Systems in Earth Orbit
NASA Plans Artemis III Lander Docking Demonstration in Earth Orbit
NASA Tests RS-25 Engine for 500 Seconds at Stennis

